RPM sample risk matrix — a 5 by 5 grid with sample risks clustered in the higher severity and occurrence cells.
Software · annual subscriptionAvailable now

The tool for risk prioritization.

Identify, score, and rank risks by the three factors that decide which ones matter most — severity, occurrence, and detection.

  • Unlimited projects & risks
  • Live severity × occurrence matrix
  • Ranked priority register
  • Full audit history & exports

$209.30/ year

$299

Save $89.70 · 30% off

What you get

Four capabilities, one habit.

01

Systematic identification

Structure risk events clearly and efficiently, so nothing critical is left to memory or scattered spreadsheets.

02

Effective prioritization

A consistent process weighs each risk so the priorities are defensible, not intuited.

03

Decision support

Optimize resource allocation and strengthen continuity by acting on what matters most, first.

04

Universal application

Adaptable to any industry or project size — from a single site to an enterprise portfolio.

See it in action

Every risk, in its place.

A quick tour of RPM beyond the matrix — how projects live together, and how every risk is scored, ranked, and ready to act on.

RPM projects list — one card per assessment, filtered by status.

01Projects

Every analysis in one place.

Filter by status, sort by recency, archive when done. Each card shows the number of risks and how many landed in the high band.

RPM record view — every risk ranked by priority score with S/O/D scores visible.

02Records

Every risk, ranked by priority.

S, O, and D scores in the open. Priority band tagged. Edit inline, or open the record to add causes, controls, and mitigation actions.

How risk assessment works

Three factors, one to five.

Every risk is weighed on three straightforward scales. Together they surface a single priority score.

01 · S

Severity

Impact if the risk occurs

  • 1 · Insignificant impact
  • 5 · Critical / catastrophic impact
02 · O

Occurrence

Likelihood of the risk occurring

  • 1 · Highly unlikely
  • 5 · Highly frequent
03 · D

Detection

Ability to detect the risk before it causes harm

  • 1 · High certainty of early detection
  • 5 · Very difficult or impossible to detect in time

The three scores combine into a single priority score, and risks are grouped High / Medium / Low so leaders know where to look first.

What's inside

Built around the way risk leaders already work.

  • Risk matrix

    A live severity-by-occurrence matrix, each risk sized by how hard it is to detect.

  • Ranked register

    Every risk ordered by priority score — the most critical items always at the top.

  • Priority band

    A single line that shows the proportion of High, Medium, and Low risks across the project.

  • Audit-ready record

    Edit any risk, see the history, archive or reopen projects. Nothing is silently lost.

See which risks matter most, first.